A typical home construction process is outlined and general contents of procedure in a processof building a house are shown in the diagram below. Weather conditions, and site inspections may alter these time estimates.

 

Apply for Permit(申請營造徐許可証)
Prepare Site(施工場地準備):Clear land, set stakes locating corners of house.

 

Excavation (挖掘): Dig basement and trenches for footings
Driveway(車道): Install culvert and apply gravel

 

Foundation (地基和基礎): Pour all footings. Pour/lay foundation walls,waterproof below grade.
Backfill (囘填):Sand is recommended in clay areas.

 

Frame House (搆筑木架系統): Build and set: floor, walls and roof systems.
Apply shingle/Install windows and exterior doors/Install siding

 

Rough Electric (電活初裝): Install meter/set service panel/connect to meter and ground. Locate and run wire to all fixtures and outlet boxes.
Rough Plumbing (水工初裝): Locate plumbing fixtures. Install soil stacks,
drain and vent pipes. Install water and gas lines.
Rough Heating(暖工初裝): Cut and install ductwork

 

Concrete Floors. Prepare compacted base and steel reinforcement. Pour and finish basement,garage and concrete floors.
混凝土地面:搗實基層, 澆搗土庫,車房和混凝土地面。

 

Insulation and Drywall. Install insulation and finish drywall
保溫層和干墻: 裝填保溫層和安裝干墻

 

Interior Finish. Paint wall and ceilings. Install all doors and cabinets. Set counter topsnds vanities. Finish trims.
室内工作完成:油漆墻,頂棚。安裝們,裝飾綫條,柜,臺面,潔具。

 

Finish Electric(電活結束):Install light fixtures,vent fans,switches, plugs and all plates.
Finish Heating(取暖活結束): Vents and grilles
Finish Plumbing(水工活結束): Install toilets, sinks, faucets, etc.

Final Grade(結束標高): Shape and grade yard to final design

 

Final Inspection(完工嚴驗查): After final inspection receive Certificate of Occupancy

Complete (竣工)---- Move in!